Prep work nearly done
The preparation is nearly done on the east end of the Erie Beach section of the Friendship Trail. The base has been built up from truckloads of gravel, slabs of the broken, busted-up concrete from the original promenade are being used along the edge and the cement will probably be poured during the next week. At the west end, the boardwalk is installed and there is new concrete all the way past the old dance hall to the spot you see at the very end of this video.
No comments:
Post a Comment